Lift shaft fire protection for landmark tower block

Heron Towers, central London

Heron Towers is a prestigious, 46-storey office building in central London, where open lift shafts with fully glazed lifts were installed during its construction. Cryotherm was chosen to provide two-hour fire protection, with a decorative finish, to the lift shaft’s steel frame.

Rockliner casings were the ideal choice and the colour Metallic Silver PVDF was specified by the architect.

The project included pre and post-sales site surveys, technical advice, fabrication of casings and support framework and the installation, which was undertaken by our approved contractor, Firesafe Installations Ltd.

Customer

Heron Towers, central London

Main Contractor

Hemsec Installations Ltd

Products:

  • Rockliner casings, 120-minute Fire Protection to beams and columns
  • Work area within glass elevator shafts, floors 2 to 46 inclusive
  • Columns to be jointed to match full height of the building

Scope:

  • Site measure, propose details and manufacture Rockliner casings
  • Columns to supply in 1375mm lengths with joint details
  • Installation from man hoist, within lift shaft
  • Metallic Silver PVDF paint finish
  • Support framework 1.5mm Galvanised

« Return

Heron_Tower_2.jpg
Heron_Tower_1.jpg
Heron_Tower_3.jpg
fabrication.jpg

From insulated panels, interior and external walls to unusual and bespoke applications

insulation.jpg

Industry experts in fire, thermal and acoustic insulation within the built environment

Elvaston_Office_Refurbishment.jpg

Innovative commercial and residential fit-out solutions, from concept to completion

Distributors of