Fire Protection & Acoustic Sealing to New Build Residential Apartments

Cryotherm was invited to provide fire protection and acoustic sealing to Brewery Wharf, a prestigious canal-side residential development near the former Tetley Brewery.

The Brewery Wharf development was part of a major regeneration of the waterfront area of Leeds city centre.

Cryotherm supplied and installed Spiralite structural fire protection and acoustic sealing to the top of party walls in the apartment complex.

Products:

  • 5000m2 of Spiralite fire protection
  • 7500m2 of acoustic sealing.

Scope:

  • Site survey and measurement
  • Supply of all materials
  • Installation of fire protection and acoustic sealing

Find Out More

Contact the expert fabrication and insulation team at Cryotherm to discover how we can design and manufacture your next project.